Geylang Living
Sims Residences

Sims Residences— Floor Plans

Sims Drive, Singapore

  • 566 Units
  • Completion: 2025
  • Condominium
  • Leasehold (99-year)

Sims Residences Floor Plans will also have Bedrooms 2, 3 & 4 perfect for single or larger families. This has designed floor plans to accommodate a more spacious living room as well as shared bedrooms because the developer understands that buyers are looking for larger units to live comfortably.

The thoughtfully designed layout contains a spacious interior with a full range of designer accessories and integrated smart home terms that help manage the smart home ecosystem of Sims Residences residents, from security to convenience living, easy. Sims Residences is an architectural achievement honoring the splendor of style and sophistication.

Get the best unit via register with us today. To know more detail, please take a look at Sims Residences developer.

Penrose Units Mix

Unit Type Unit Size (sq ft) No. Of Unit
1-Bedroom 474 - 517 FULLY SOLD
1-Bedroom (with Study) 560 - 570 FULLY SOLD
2-Bedroom 646 FULLY SOLD
2-Bedroom Premium 700- 710 FULLY SOLD
2-Bedroom (with Study) 797 - 807 FULLY SOLD
3-Bedroom 936 - 980 105
3-Bedroom Premium 1044 - 1098 123
3-Bedroom (with Study) 1173 - 1184 54
4-Bedroom 1389 - 1399 54
TOTAL 566 Units

Penrose Schematic Diagram

Penrose Condo

20 Sims Drive Singapore 387395

Penrose Condo

26 Sims Drive Singapore 387398
28 Sims Drive Singapore 387399

Penrose Condo

22 Sims Drive Singapore 387396

Penrose Condo

30 Sims Drive Singapore 387400


Block 20 - 1st Floor Plans, 5th Floor Plans & 6-18th Floor Plans

Penrose Condo

Penrose Condo

Penrose Condo


Block 22 - 1st Floor Plans, 5th Floor Plans & 6-18th Floor Plans

Penrose Condo

Penrose Condo

Penrose Condo


Block 26 - 1st Floor Plans & 2nd-18th Floor Plans

Penrose Condo

Penrose Condo


Block 28 - 1st Floor Plans & 2nd-18th Floor Plans

Penrose Condo

Penrose Condo


Block 30 - 1st Floor Plans, 3rd - 17th Floor Plans & 18th Floor Plans

Penrose Condo

Penrose Condo

Penrose Condo


Penrose Floor Plans

1-Bedroom

Penrose Condo

Penrose Condo


1-Bedroom (with Study)

Penrose Condo

Penrose Condo


2-Bedroom

Penrose Condo

Penrose Condo


2-Bedroom Premium

Penrose Condo

Penrose Condo


2-Bedroom (with Study)

Penrose Condo

Penrose Condo


3-Bedroom

Penrose Condo

Penrose Condo


3-Bedroom Premium

Penrose Condo

Penrose Condo


3-Bedroom (with Study)

Penrose Condo

Penrose Condo


4-Bedroom

Penrose Condo

Penrose Condo

Make an Enquiry

Book an appointment and view ShowFlat. Alternatively, please fill the form to get a copy of E-Brochure.<br> We will get back to you as soon as possible.

Enquire